Projeto de forro de barragem de rejeitos e revestimento de lagoas de leaching no Congo

Dec 26, 2019

In 2014, our company undertake the lining project of tailing waste dam and leaching pond in Congo.

Most parts of Congo are in tropical climate with average weather degree of 27.8°c. The weather is hot and wet with strong ultraviolet. Considering this location and climate conditions, ourYINGFAN company used combination of bentonite GCL,GEOmembrano HDPEegeotêxtilas the composit leakage prevention systemin our contracted tailing waste pond and leaching pond project. This containment system could totally make sure the engineering quality and usage life span. The leaching pond base were all concrete lined as the lining base of our hdpe geomembrane.

These two lining projects were designed as the following drawing:
needle-punched-geotextile china-needle-punched-geotextile

Our company provided installation service for this project and got good recognition from our client.